Concrete Trial Mix For The Construction Of 2nd
Penang Bridge
The 2nd concrete trial mix for the construction of the 2nd
Penang Bridge was conducted in the structural laboratory of Dura Technology Sdn
Bhd, located 12 km away from the heart of Ipoh city. The event was conducted on
3rd December 2008. Among the group presence for this event is
representative from BASF(M) Sdn Bhd, Sika Kimia Sdn Bhd and engineers from China
Harbour Engineering Co. Ltd (CHEC).