DURA Composite Bridge for Busy Road at Teluk Intan, Hilir Perak


Project:
Cadangan Menggantikan Pembentung Sediada, Melebarkan Jalan Dan Kerja-Kerja Di Laluan FT 058 Seksyen 3.50, Daerah Hilir Perak, Perak D.R.

Structure Type: Single span 8m x 17m wide UHPdC composite bridge.

Superstructure Feature: 22 pieces of DURA® UB650-8m

Substructure Feature: 450mm diameter spun piles (Class B)

Client: Jabatan Kerja Raya Malaysia   JKR 

Consultant: Jurutera Perunding Concrete Technology

Contractor: Belanti Wangsa (M) Sdn Bhd   belati wangsa

Status: Completed
Sungai Parit Selatan.
Existing old pipe culvert over Sg. Parit Selatan (31/03/2013)
FT058 road.
Lifting of light-weight DURA I beam (24/10/2013).
First phase of the new bridge open for traffic (14/12/2013).
First phase of the new bridge open for traffic (14/12/2013).
Flap gate installed (08/02/2014).
Second portion of the new bridge open for traffic.
Construction of last portion of the abutments.
Last batch of precast I beam launched (12/03/2014).
Premixing the road (11/04/2014).
Premixing the road (11/04/2014).
The completed bridge.
The completed bridge.
The completed bridge.
The completed bridge.
The completed bridge.
The completed bridge.
Sungai Parit Selatan.