Construction of a New Bridge at Mardi, K. Kangsar

mardi pana 2

Project:
MEMBINA BARU SEBUAH JAMBATAN KONKRIT DUA LORONG MERENTASI SUNGAI KANGSAR SERTA KERJA KERJA BERKAITAN BAGI PROJECT MENAIKTARAF JALAN MASUK KE PUSAT PENYELIDIKAN MARDI NEGERI PERAK DI KUALA KANGSAR, PERAK D. R.

Structure Type: Single span 32m long by 8m wide UHPC integral beam-deck system.

Superstructure Feature: 5 pieces of DURA® TBG1325-31.5m

Substructure Feature: 300mm Dia. Spun Pile (Class B)

Loading Type: Full HA+30 unit HB loadings

Client: Ministry of Agriculture, MOA

Consultant: Perunding Azizi

Contractor: Nazah Tegoh Enterprise

Contract Period: 25 weeks

Construction Status: Completed

Project signboard and detail.
The existing old bridge.
The existing old bridge.
Representatives and officers from ministry of agricultre (MOA) visited a Dura bridge in Ulu Chemor (10/10/2013).
Existing old bridge demolished (11/10/2013).
Piling completed (01/11/2013).
Piling completed (01/11/2013).
DURA beams ready for post-tensioning (11/12/2013).
Abutments ready for beam launching.
Beam launching day (20/12/2013).
Uploaded first beam onto prime movers.
Transporting 1st beam to bridge side.
Lifting of 4th beams (20/12/2013).
Lifting of 4th beams (20/12/2013).
Positioning the 4th beams (20/12/2013).
Beam launching day (20/12/2013).
The new Mardi bridge soon will be ready.
Preparing for the construction of approach slab.
Mardi bridge premixed (14/02/2014).
Newly completed Mardi Bridge.
Newly completed Mardi Bridge.
Newly completed Mardi Bridge.
After 3 months (18/05/2014).
After 3 months (18/05/2014).
After 3 months (18/05/2014).
Project signboard and detail.