Replacement Bridge at Main Road to Kg. Pahat using Single Span UHPFRC


Project   : To Replace Bridge at Main Road to Kg. Pahat, Daerah Hulu Perak, Gerik, Perak.


 
(Membaikpulih Jambatan Jalan Utama Kg.Pahat, Daerah Hulu Perak, Gerik, Perak Darul Ridzuan )

 
GPS Location: 5.4949310 N; 101.1214160 E

Structure Type: Single Span UHPFRC Composite In-Situ Deck Bridge System : 12m x 4m wide.

Superstructure Feature: 3 pieces of DURA® IB650-12m with Cast In-Situ Grade40 RC Deck.

Substructure Feature: 2 nos. of cast in-situ RC abutments.

Foundation Feature: 200mm x 200mm Square RC pile.

Loading Type: HA+KEL or 30 units HB loadings

Client: Jabatan Tanah Gerik

S.O.: Jabatan Tanah Gerik

Consultant: JPCT

Contractor: SADAN WORKS ENTERPRISE

Contract Period: 3 Months

Construction Status: Completed        

Driving of RC piles.
PDA test.
Completion on driving of RC pile at one abutment.
Construction of pile cap.
Pile cap concreted.
Unload beams.
Beam launching.
Three I-beams positioned.
Installation of left-in formwork.
Beam and formwork fully installed.
Installation of RC deck reo and formworks.
Completed Kg Pahat Bridge.
Completed Kg Pahat Bridge.