DURA Joint-Fill used in Canada MOT Project

Project Title: White Lake Narrows bridge, Highway 17, Ontario, Canada 

GPS Location: 48.721526N, -85.62603W

Structure Type: 
In-filled UHPC material for precast concrete deck

Client
: Ontario Ministry of Transportation

S.O.: TBT Engineers

Consultant: Stantec Consulting

Contractor/designer: Facca Incorporated

Contract Period: 12 months

Construction Status: Stage 1 and 2 Completed Summer 2018

Existing White Lake Bridge.
Pan mixer used at the site to batch DURA-UHPFRC.
Transporting DURA-UHPFRC for joint stitching.
Filling pockets of precast bridge deck panel with DURA.
Cover UHPC in-filled with piece formwork.
Removal of timber formwork afetr 1 day.