2018 Projects

Single Span UHPC Bridge at Ulu Lawin, Perak


Project: To Construct Bridge at Ulu Lawin, Daerah Hulu Perak, Gerik, Perak Darul Ridzuan.


 (Membina Jambatan Ulu Lawin, Daerah Hulu Perak, Gerik, Perak Darul Ridzuan).

 GPS Location: 5.300921 N; 101.052175 E 

Structure Type: Single Span UHPC Beam Composite In Situ Deck Bridge System : 18m x 4m wide.

Superstructure Feature: 3 piece of DURA® IB650-18m with Cast In-Situ RC Deck

Substructure Feature: 2 nos. of cast in-situ RC abutments

Foundation Feature: 200mm x 200mm RC pile.

Loading Type: HA+KEL or 30 units HB loadings

Client: Pejabat Daerah Dan Tanah, Hulu Perak, Gerik Perak

S.O.: Jurutera Daerah , JKR Daerah Perak JKR

Consultant
: Jurutera Perunding Concrete Technology

Contractor: FD Construction and Supplier

Contract Period: : 3 Months

Construction Status: Completed
Sg Lawin.
RC square pile used as foundation.
RC piles installed.
Construction of RC abutments.
Abutments done and ready for beam launching.
Transportation of Dura I-beam to site and ready for beam launching (110618).
Three I-beams launched on to abutments.
Installation of left-in formwork onto DURA I-beams.
Construction of In-situ RC decking (060918).
Completion of Ulu Lawin bridge(021018).
Completion of Ulu Lawin bridge(021018).
Completion of Ulu Lawin bridge(021018).
Completion of Ulu Lawin bridge(021018).
Completion of Ulu Lawin bridge(021018).
Sg Lawin.
01/14 
start stop bwd fwd

Single Span Bridge at Kemuning Machang


Project: To Construct Bridge at Kg. Kemuning, Machang, Kelantan.


(Projek Membina Jambatan Dari Kg Kemuning Ke Pangkal Kuang, Kemuning, Machang, Kelantan).

GPS Location: 5.751480 N; 102.2061310E

Structure Type: Single Span 23m by 4m Wide Composite Bridge System.

Superstructure Feature: 3 piece of DURA® IB850-23m with Cast In-Situ RC Deck

Substructure Feature: 2 nos. of cast in-situ RC abutments

Foundation Feature: 200mm Sq RC Pile. 

Loading Type: Combination HA + 30HB Unit
 
Client: Kementerian Kemajuan Luar Bandar & Wilayah  Logo KKLW

S.O.: Kementerian Kemajuan Luar Bandar & Wilayah  Logo KKLW

Consultant: MZMS Consultant

Contractor: JLE Jalinan Ilham Enterprise

Contract Period: 3 Months

Construction Status: Completed 

Proposed new bridge at Kg Kemuning.
Construction of RC abutments at river bank.
Construction of RC abutments.
Transportation of three number of DURA IB650-23m using low loader.
Reversing beam for beam launching.
45 tonnes capacity mobile crane used for beam launching.
Lifting of beam 1.
Positioning beam 2.
Lifting of last beam.
Placing left-in formworks.
All left-in formworks positioned.
Completed bridge.
Completed bridge.
Completed bridge.
Proposed new bridge at Kg Kemuning.
01/14 
start stop bwd fwd

Single Span UHPFRC Bridge for (Bridge 2) Bukit Gambir, Ledang Johor.


Project   : To Change a Narrow and Old bridge at KM 1.9, 3.3, 4.9 and 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang Johor, Johor Darul Takzim (Bridge 2).


(Cadangan Menggantikan Jambatan Sempit Di KM 1.9, 3.3, 4.9 Dan 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang Johor, Johor Darul Takzim)
 
GPS Location: 2.2421633 N; 102.6667053 E (Bridge 2)

Structure Type: Single Span UHPC I Beam Composite In Situ Deck Bridge System: 18m x 12.5m wide.

Superstructure Feature: 9 pieces of DURA® IBeam650-18m

Substructure Feature: 2 nos. of cast in-situ RC abutments and 2 nos. of cast in-situ RC piers.

Foundation Feature: 450mm dia. Spun pile (Class B)

Loading Type: HA + 30 units HB loadings (BD37/01)

Client: JKR Johor  JKR              S.O.: JKR  JKR

Consultant: Perunding Sejati Sdn Bhd

Contractor: Golden Kluang Sdn. Bhd.

Contract Period: 12 months

Construction Status: Completed        

600mm dia, spun piles used as foundation.
600mm dia, spun piles used.
Construction if abutments.
Bridge site.
Construction of abutments.
Abutment A.
Beam launching in progress using mibile cranes (231217).
Positiong of precast beams on the abutments (231217).
Lifting of 5th beams using two units of 20 tonnes mobile crane (231217).
All Dura IB650-18m are launched in position (231217).
Completed Bukit Gambir bridge 2.
Completed Bukit Gambir bridge 2.
Completed Bukit Gambir bridge 2.
Completed Bukit Gambir bridge 2.
Completed Bukit Gambir bridge 2.
Completed Bukit Gambir bridge 2.
Completed Bukit Gambir bridge 2.
600mm dia, spun piles used as foundation.
01/17 
start stop bwd fwd

Single Span UHPC Bridge used at Bukit Gambir (Bridge 1) , Johor


Project: To Change a Narrow and Old bridge at KM 1.9, 3.3, 4.9 and 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang Johor, Johor Darul Takzim.


(Cadangan Menggantikan Jambatan Sempit Di KM 1.9, 3.3, 4.9 Dan 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang Johor, Johor Darul Takzim)

GPS Location: 2.2312473 N; 102.6607008 E (Bridge 1)

Structure Type: Single Span UHPC I Beam Composite In Situ Deck Bridge System : 18m x 12.5m wide.

Superstructure Feature: 9 pieces of DURA® IBeam650-18m

Substructure Feature: 2 nos. of cast in-situ RC abutments and 2 nos. of cast in-situ RC piers.

Foundation Feature: 300mm dia. Spun pile (Class B)

Loading Type: HA + 45 units HB loadings (BD37/01)

Client: JKR Johor   JKR                          S.O.: JKR    JKR

Consultant: Perunding Sejati Sdn Bhd

Contractor: Golden Kluang Sdn. Bhd.

Contract Period: 12 months

Construction Status: Completed        

Demolition and site clearing work.
Piling of 60mm spun pile.
Bridge site.
Piling work completed.
Abutments (221217).
Plint seating and dowel bars are ready (221217).
Lifting of beams using two mobule cranes 220118).
Two beams positioned.
Four beams positioned.
Positioning 6th beams.
Positioning 7th beams.
All 9 beams launched within 2 hours.
All beams launched.
Completed Bukit Gambir bridge 1.
Completed Bukit Gambir bridge 1.
Completed Bukit Gambir bridge 1.
Completed Bukit Gambir bridge 1.
Completed Bukit Gambir bridge 1.
Demolition and site clearing work.
01/18 
start stop bwd fwd

DURA Bridge Girder used at Busy Jalan Leong Boon Swee of Ipoh


Project
: Menggantikan Jambatan di Atas Sg. Kinta, Kampung Paloh, Mukim Ipoh, Daerah Kinta, Perak D.R.

(To Replace the Existing Bridge Crossing Kinta River, Kampung Paloh, Mukim Ipoh, Kinta District, Perak D.R.)

GPS Location: 4.590579N, 101.075945 E

Structure Type: Single Span 55m by 25m wide UHPC Composite Bridge System.

Superstructure Feature: 10 pieces of DURA® UBG2000-55m

Substructure Feature: 2 nos. of cast in-situ RC abutments

Foundation Feature: 300mm dia. micropiles

Loading Type: HA + KEL Loading + 45 Units HB Loadings (BD37/01)

Client: Kerajaan Negeri Perak / JKR Perak    JKR

Consultant: Perunding Warisan    Warisan logo

Contractor: Sanjung Sempurna S/B (G7)

Contract Period: 24 months

Construction Status: Completed       

Existing Kampung Paloh Bridge at Jalan Leong Boon Swee, crossing Sungai Kinta of Ipoh.
Existing Kampung Paloh Bridge at Jalan Leong Boon Swee, crossing Sungai Kinta of Ipoh.
Underneath view of the existing old bridge.
Side view of existing bridge.
Construction of 300mm diameter micropiles at abutment A.
Construction of 300mm diameter micropiles at abutment B.
Partially constructed abutment A ready to reach precast beams.
Installation of PC strands for UBG2000-55m.
Five PT DURA U beams placed behind abutment B and ready for beam launching (230417).
Five PT DURA U beams placed behind abutment B and ready for beam launching (230417).
Five PT DURA U beams placed behind abutment B and ready for beam launching (230417).
Lifting of first U-beam (260417).
Beam launching of second U-beam (270417).
Transportation of second U-beam for beam launching (270417).
Beam launching of second U-beam (270417).
Five numbers of DURA UBG2000-55m positioned (290417).
Five numbers of DURA UBG2000-55m positioned (290417).
Formwork preparation for in-citu RC deck.
Formwork preparation for in-citu RC deck.
Formwork preparation for in-citu RC deck.
Formwork preparation for in-citu end diaphragm.
First half of the bridge completed and open for traffic.
Existing bridge demolished.
Unloading of DURA U Beams.
Three more UBG2000-55m assembled near site.
Second half of the bridge completed.
Second half of the bridge completed.
New Kg Paloh birdge.
Pier-free 55m span bridge.
Completed Kg Paloh bridge.
Completed Kg Paloh bridge.
Completed Kg Paloh bridge.
Completed Kg Paloh bridge.
Completed Kg Paloh bridge.
Existing Kampung Paloh Bridge at Jalan Leong Boon Swee, crossing Sungai Kinta of Ipoh.
01/34 
start stop bwd fwd


© 2009-2019 by GPIUTMD