China Foot Bridge 2 - Double Span 30m

Project: Extension and Reconstruction of Huadu Avenue (North Approach Junction of Airport to Cotton Tree Drive)

花都大道(机场北进路口至红棉大道段)扩建改造工程K11+915

GPS Location: 23.434114°E, 113.210209°N

Structure Type: Double Span 30m by 5.3m wide Double T-UHPC Bridge Girder

Superstructure Feature
: 2 pieces of Double Tee-Integral Beam-Deck Bridge

Substructure Feature
: Cast in-situ RC piers

Foundation Feature
: 1m dia. Bored piles

Loading Type
: 5 kPa

Client
:    广州市花都区地方公路管理站Guangzhou Huada District Local Highway Management Station

Consultant: 广州市公路勘察设计有限公司Guangzhou Highway Survey and design Co. Ltd

Contractor: 广东华隧建设集团股份有限公司Guangdong Hua Tunnel Construction Group Co. Ltd

Construction Status: Under Construction
A 30m long double T beam yet to be post-tensioned.
30m long double T beam.
A 30m long double T beam yet to be post-tensioned.
30m long double T beam.
A 30m long double T beam yet to be post-tensioned.