DURA Long Span U Girder Used in Duke 3 Section 2 from Pier 21 to Pier 50

Project: Setiawangsa - Pantai Expressway (SPE) - DUKE Phase 3, Section 2 (Pier P21 – P50)

GPS Location: 3.130406 N; 101.718122 E (55.6m ML/P49 – ML/P50); 3.126035 N; 101.715160 E (63.2m ML/P32 – ML/P33); 3.123310 N; 101.713464 E (59.1m ML/P23 – ML/P24); 3.122491 N; 101.712953 E (59.1m ML/P21 – ML/P22)               

Structure Type: Total Eight Spans of PT Segmental UHPC U-Girder Composite Bridge System.  

Superstructure Feature: Total 18 pieces of DURA® UBG2500 – 55.5m – 59.1m and 6 pieces of DURA® UBG3000 – 63.2m (Av.) with Cast In-Situ RC Deck

Substructure Feature:
Cast in-situ RC piers

Foundation Feature: 1.2m Dia. Bored Piles

Loading Type: HA+ 45 units HB loadings (BD37/01)

Client: Lembaga Lebuhraya Malaysia (LLM)

S.O.: Lembaga Lebuhraya Malaysia (LLM)

Consultant: EDP Consulting Group Sdn Bhd

Contractor:
Ekovest Construction Sdn Bhd / Azutama

Construction Status: Under Construction