DURA 70m Girder Used at Duke , Section 2 Interchange 3 Ramp 3A

Project: Interchange 3 - Pandan - Duke Phase 3, Section 2 (Salak - Pandan), Construction & Completion of Bridge Structure Works for Pandan Interchange (Ramp 3A Only)

GPS Location:
3.138564°N, 101.721205°E (61.5m Ramp R3A/P7 – R3D/P4); 3.138622°N, 101.720946°E (70m Ramp R3A/P7 – R3A/P8); 3.138693°N, 101.720534°E (61.8m Ramp R3A/P8 – R3A/P9)

Structure Type: Three Spans UHPC PT U-Girder with Composite Bridge System.

Superstructure Feature
: Total 3 pieces of DURA® UBG2500 – 60.2m – 61.7m and 2 pieces of DURA® UBG3000 – 69.8m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC piers

Foundation Feature: 1.2m Dia. Bored Piles

Loading Type: HA+ 45 units HB loadings (BD37/01)

Client: Lembaga Lebuhraya Malaysia (LLM) 

S.O.: Lembaga Lebuhraya Malaysia (LLM) 

Consultant:
EDP Consulting Group Sdn Bhd

Contractor:
Ekovest Construction Sdn Bhd / Pembinaan Jemerlang Sdn Bhd

Contract Period:

Construction Status:
Under Construction

%MCEPASTEBIN%
Unloading of UBG2500 segment for beam assembly (180520).
Pier P7 where the beam sit.
Unloading of UBG2500 segment for beam assembly (180520).
Pier P7 where the beam sit.
Unloading of UBG2500 segment for beam assembly (180520).