Singapore Project - The ARTRA Residential Flat at Alexendra View


Project: Proposed Erection of A Block Residential Flat (Total: 400 Units), Two Levels of Basement Car Park with Provision for Swimming Pool and Communal Facilities with Provision for Swimming Pool and Communal Facilities with the Commercial at 1st Storey (URA Sale Parcel) MK01 on Lot 03995V at Alexandra View (Bukit Merah 
Planning Area) - Alexandra View (PBU)


GPS Location
: 1.290028 N, 103. 816750 E

 Product Type: 858 pieces Customised Lithe - DURA UHPFRC Precast Bathroom Unit (PBU) Carcass

Client: FEC Skyline Pte. Ltd.

Contractor: Tiong Seng Contractors (Pte) Ltd    TS Logo

PBU Supplier: Robin Village Development Pte Ltd    robin village

Contract Period: 2019

Construction Status: On- Going

Partial UHPFRC Box Girder Design Used at Eight Spans Bridge at Kampung Lambor Crossing Sg. Perak

  
Project: To Construct Bridge at Lambor (Crossing Sungai Perak).


(Membina Jambatan Menghubungkan Kg. Lambor Kiri Ke Kg. Lambor Kanan (Merentasi Sg. Perak).

GPS Location: 4.269773 N, 100.901552 E

Structure Type: Eight Span 404m by 11.5m Wide Composite Bridge System.

Superstructure Feature: 8 piece of DURA® GUBG2000-50m with Cast In-Situ RC Deck

Substructure Feature
: Cast in-situ RC abutments

Foundation Feature: 600mm dia. Spun Pile (Class B). 

Loading Type: LM1 & LM3 (SV100)

Client: Jabatan Kerja Raya Malaysia  JKR
S.O.: JKR Daerah Perak Tengah   JKR

Consultant: JKR Malaysia JKR

Contractor: Everfine Resources Sdn Bhd

Contract Period: 24 Months

Construction Status:  Under Construction
Project Signboard
Original Site at Lambor
Original Site at Lambor
Construction of temporary bridge. (290918).
Piling work in progress (290918).
Pile maintain load test.
Cofferdam and pile cap construction.
Construction of temporary bridge.
Construction of Abutment A in progress (040219)
Pier 1 and pier 2 constructed (040219).
Foundaton of Pier 6 under construction (040219).
Pier 7 in progress (040219).
Match casting od segment 6 of GUBG2000-50m (260319).
Demoulding end segment 1 (030419).
Matching casting of GUBG2000 segments.
Lifting of GUB2000 segment.
Temperature measured after demoulding.
Installation of Giant U girder segment in progress (280519).
Installation of GUBG in progress (280519).
Installation of GUBG in progress (280519).
Installation of GUBG in progress (280519).
Temporary tie rods used to hold the segments in position.
Post-tensiong work using two jack simultaneously in progress.
Installation of deck reinforcement (140819).
Soffit view for span 2 (140819).
Casting of in-situ RC deck (200819).
Giant U bridge girder store in the yard ready for transportation
Post-tensioning the last GUBG2000 (span 8).
Site progress on 12 Oct 2019.
8 spans DURA precast girder assembled.
Four spans RC deck has been constructed (121019).
Construction of RC deck in progress (211019).
Project Signboard
01/32 
start stop bwd fwd

Single Span UHPFRC Bridge used at Kampung Parit Markom, Pontian


Project: To Construct Bridge at Kampung Parit Markom, Pontian, Johor.


(Membina Jambatan Baru Di Kampung Parit Markom, Mukim Sungai Pinggan, Pontian, Johor)

GPS Location: 1.697692 N, 103.315407 E

Structure Type: Single Span 52m by 5m Wide Composite Bridge System.

Superstructure Feature: 1 piece of DURA® UBG2000-52m with Cast In-Situ RC Deck

Substructure Feature: Cast in-situ RC abutments

Foundation Feature: 450mm Diameter Spun Pile (Class B, Grade 80)

Loading Type: Combination HA + 30HB Unit

Client: JPS Malaysia

S.O.:

Consultant: N/A

Contractor: Glorius Trading

Contract Period:

Construction Status: Under Construction
 
Project Signboard
Original site of Kg Parit Markom
Side view of existing bridge
Prepartion of temporary crossing with pipe culverts install at the waterway (140519).
Bridge site.
Assembly of segments (050819).
Assembly of segments (050819).
U beam fully assembled (050819).
Project Signboard